Decommissioning Project


ongoing
Restoration and dismantling of the turbine building systems

The Turbine Building hosts the systems and components, that, during the operation period of the plant, were used to transform the thermal energy ...

ongoing
Reactor dismantling

The core of the plant, were energy was produced from a nuclear source, is called nuclear island. It is the most difficult component to dismantle, since it contains the highest levels of residual radioactivity of the plant. ....

completed
Demolition of the old chimney and construction of the new chimney

During the operation period, the chimney was used to channel the discharge of gaseous effluents coming from the turbine, the reactor and the Radwaste, all operating in vacuum condition and, thus, requiring a controlled exit point.

ongoing
Implementation of the new system to treat radioactive liquid effluents

The drainage works for the floors of classified areas, laundries of radioprotection devices and activities involved in the surveillance procedures, produce radioactive liquid ...

completed
Creation of tanks for rainwater collection

The collection tanks, which have been created according to the provisions of the VIA Decree of 2009, allow the collection and treatment of run-off waters of the coated ...

ongoing
Trenches Reclamation

During the plant operation period, three trenches have been created to bury, according to the international standards of that time, low-level radioactive waste

ongoing
New water supply system

The new water supply system included the creation of a new shaft and new hydraulic works for underground water transportation to be used for industrial purposes within the plant – such as fire protection systems of the controlled area, plant washing opera

completed
Restoration of water intake structures

The water intake structures channel the water of Garigliano River into the plant, to use it as a “vector” for the liquid radioactive waste (service water) and ...