Trenches Reclamation

​​Status: Ongoing 
Period: 2014-2021

During the plant operation period, three trenches have been created to bury, according to the international standards of that time, low-level radioactive waste resulted from the operations of the plant.

In 2014, trenches 2 and 3 have been reclaimed, while in 2017, the preparatory works for the reclamation of trench 1 have been launched and they are still ongoing.

The waste produced by reclamation of trenches 2 and 3 have been stored in the interim storage facility D1, while waiting for their final disposal in the National Repository.

Same process will be adopted for the waste resulting from trench 1.