Adaptation of premise B106

​​Status: Ongoing
Period: 2017-2019

Adaptation works for the premise B106, located within the building BLD1, have been launched in 2017.
Upon completion of these works, the premise B106 will be able to host all radioactive waste of the site, before its shipment to the National Repository. 

Radioactive Waste is currently stored in a building closed to the BLD1, called BLD11. The latter was adapted to a temporary buffer and started being operational in 2012; since then, the structure has collected the waste stored in various areas of the plant. 

Adaptation of B106 to interim storage facility is expected to conclude by the first half of 2019. This will enable moving the waste stored in the buffer station to B106 interim storage facility.